TSB makes safety recommendations for improved track inspections following 2015 derailment in Ontario

Written by Maggie Lancaster, assistant editor
image description
A broken rail in joint bars and wheel flange damage to top of joint bar from the Gogama derailment site.
Transportation Safety Board of Canada

The Transportation Safety Board of Canada (TSB) is recommending that Transport Canada (TC) incorporate predictive data on rail surface conditions to help better focus its targeted regulatory track inspections.

The recommendation was issued as a part of TSB’s investigation into the March 2015 derailment and fire involving a Canadian National (CN) freight train near Gogama, Ontario.

On March 7, 2015, a CN unit train transporting 94 tank cars loaded with petroleum crude oil derailed on CN’s Ruel Subdivision near Gogama, Ontario. Although the train was travelling below the 50 mph speed limit, 39 tank cars derailed, spilling about 2.6 million liters (686,847 gallons) of crude oil, which ignited, caused explosions and contaminated the nearby Makami River. A CN rail bridge was destroyed, along with about 1,000 feet of track.

“The investigation found that certain data on deteriorating rail surface conditions are not always considered by Transport Canada when it plans its inspections,” said Kathy Fox, Chair of TSB. “By integrating data on these ‘leading indicators’—which could be predictive of future rail failures—the targeted inspections would be better focused.”

TSB’s investigation found that the derailment occurred after a recently repaired rail within a joint broke under the train. Three days prior to the accident, a track maintenance employee had repaired a broken rail by installing a plug rail. The employee had cut the defective rail out of the track, visually inspected the remaining exposed rail ends and installed the plug rail. However, although required under CN standards, a dye penetrant test to find defects that are not always visible to the naked eye was not performed prior to the repair. As a result, a vertical split head, which is an internal defect, was not detected and remained in the south rail after the repair. Additionally, following the repair, the rail head ends within the joint were mismatched. To ease the transition between the rail heads, grinding on the plug rail head end was performed, but it was insufficient and a step between the two rail heads remained. TSB says that given the state of the repair, a mandatory “slow order,” which would have required trains to reduce speed at this location, should have been issued but was not.

Additionally, TSB found that CN’s procedures for rail testing and installing a plug rail were located in multiple manuals, making them difficult to find. TSB also discovered that employees were not given checklists, which could have outlined the steps required to complete the work. In this situation, while the employee was aware of the dye penetrant test, they had not performed it or seen it done during the course of their duties. TSB found that CN’s training did not highlight the importance of the test, nor did it provide opportunities for practical hands-on training.

With regard to improving future inspections, Chair Fox noted that Canadian railways regularly inspect their track networks for specified rail defects.

“Railways gather information, including data on leading indicators, such as localized surface collapse, rail end batter and crushed heads and TC needs to acquire this information. Without it, the targeted TC track inspections simply won’t be as effective as they otherwise could be. This is the focus of the recommendation we issued today,” said Chair Fox.

The full investigation is available here.