Track Structure

Pettibone/Traverse Lift, LLC’s new Speed Swing 445F2 rail crane is powered by a fuel-efficient 163-horsepower Cummins QSB4.5 Tier 4 diesel engine.

Pettibone Upgrades Speed Swing Crane

Pettibone/Traverse Lift, LLC has rolled out the Speed Swing 445F2, an updated version of what it calls “the industry’s original do-it-all rail crane,” which was “developed with customer feedback in mind” and

BMWED Passenger-Rail Groups Merge

The Brotherhood of Maintenance of Way Employes Division (BMWED) has announced that members of its Chicago Passenger Federation (CPF) have voted to merge with its United Passenger Rail Federation (UPRF).

Norfolk Southern

Norfolk Southern Works to Repair Alabama Lift Bridge

After being damaged by a vessel, Norfolk Southern’s lift bridge spanning the Tennessee River in Decatur, Ala., is expected to remain out of service for up to five days, the railroad announced in a service alert on Jan. 17.

(East San Fernando Valley Light Rail Transit Rendering, Courtesy of LA Metro)

AMM JV Selected for East San Fernando Valley LRT Project

Joint venture partners Arcadis and Mott MacDonald (AMM JV) on Jan. 17 reported that they will serve as Construction Management Support Services consultant for the East San Fernando Valley Light Rail Transit Project at LA Metro (Los Angeles County Metropolitan Transportation Authority).

The San Dieguito Double Track and Platform Project is slated to replace the nearly 100-year-old wooden trestle across San Dieguito Lagoon, add about one mile of double track in Solana Beach and Del Mar, and add a special events platform at the Del Mar Fairgrounds, according to SANDAG. (Photograph Courtesy of SANDAG)

Report: NCTD, Del Mar at Odds, Again

North County Transit District (NCTD) and the city of Del Mar, Calif., disagree on how to spend a $300 million grant from the state’s Transit and Intercity Rail Capital Program, according to The San Diego Union-Tribune.

Metrolinx will install a new steel pipe culvert as part of the Toronto Lakeshore East Rail Corridor project.

Watch: Metrolinx’s Culvert Replacement Project

Crews will be replacing a collapsed culvert with a new steel pipe culvert in Small’s Creek, as part of Metrolinx’s Toronto Lakeshore East Rail Corridor project. The work will restore the creek’s water flow through the embankment, improve drainage and reduce the risk of flooding.